A+ | A- | Reset
154.60.02 IMPROVEMENT LOCATION PERMIT
154.60.02           IMPROVEMENT LOCATION PERMIT
 
154.60.02.01      Start of construction prohibited without improvement location permit
 
                           It shall be unlawful for an owner, lessee or tenant to begin any excavation or construction, reconstruction, extension, conversion or alteration of any building or structure, until an Improvement Location Permit shall have been issued by the Zoning Inspector.
 
                           Such permit shall show that such buildings or premises or a part thereof, and the proposed use thereof, are in conformity with the provisions of this Ordinance. It shall be the duty of the Zoning Inspector to issue such a permit, provided he is satisfied that the structure, building or premises, and the proposed use thereof, and the proposed methods of water supply and disposal of sanitary waste, conform with all of the requirements of this Ordinance.
 
154.60.02.02      Excavating - Permit
 
                           No permit for excavation or construction shall be issued by the Zoning Inspector, unless the plans, specifications and the intended use conform to the provisions of this Ordinance.
 
154.60.02.03      Zoning inspector to act within ten (10) days
 

            The Zoning Inspector shall act upon all such applications on which he is authorized to act by the provisions of the Ordinance within ten (10) days after they are filed in full compliance with all the applicable requirements. He shall either issue an Improvement Location Permit within said ten (10) days or shall notify the applicant in writing of his refusal of such permit and the reasons thereof. Failure to notify the applicant in case of such refusal within said ten (10) days shall entitle the applicant to a permit unless the applicant consents to an extension of time



More Categories: