58.02 Fee Schedule
58.02 FEE SCHEDULE: The Landfill shall collect user fees as follows:
(1) Commercial, Industrial and Institutional residents within the Richmond Sanitary District shall be charged the following fees for solid waste accepted by the Landfill for disposal subject to a minimum fee of $4.50, to-wit:
(A) ORDINARY SOLID WASTE
Solid Waste generated by operations. The term does not include:
special waste, infectious waste, coal or fly ash- 27.00/ton
(B) INDUSTRIAL PROCESS WASTE
(Identified as any byproduct of a manufacturing process
outside of normal waste - $32.00/ton
(C) SPECIAL MANAGEMENT WASTE
Identified as any waste requiring special handling by
Landfill Personnel -$55.00/ton
(D) APPROVED WASTE FOR ALTERNATIVE DAILY COVER- $9.00/ton
(E) Construction/demolitioN WASTE
The landfill will charge all customers for the disposal of
Construction/demolition waste - $23.00/ton
(2) Commercial, Industrial , and residential waste generated outside the Richmond Sanitary District will be charged the following fees for all waste accepted by the Landfill for disposal subject to a minimum fee of $4.50, to-wit:
(A) ORDINARY SOLID WASTE
Solid waste generated by operations.
The term does not include: special waste, infectious waste,
or results from combustion of coal - $33.00/ton
(B) INDUSTRIAL PROCESS WASTE
Identified as any byproduct of a manufacturing process outside
of normal waste - $38.00/ton
(C) SPECIAL MANAGEMENT WASTE
Identified as any waste requiring special handling by Landfill
Personnel - $55.00/ton
(D) APPROVED WASTE FOR ALTERNATIVE DAILY COVER - $9.00/ton
(E) CONSTRUCTION/DEMOLITION WASTE
The Landfill will charge for all construction/demolition waste - $29.00/ton
3) An additional charge of $2.00 per ton will be assessed on all disposals as required by applicable State and Local regulations.
(4) Residential residents within the Richmond Sanitary District shall not be charged any fee for normal, customary, household waste, disposed of at the Landfill.
(5) MATERIALS SEGREGATED FROM WASTE STREAM
For all customers, the following charges shall apply, if such waste is segregated.
(A) Clean Fill dirt, brick, block, cement, etc - $9.00/ton
(B) Raw wood compost able waste: brush, wood pallets, yard waste - $19.50/ton
(B) Freon Units: refrigerators, air conditioners, de-humidifier -$35.00/unit
(C) Ferrous Metal, cardboard, and recyclable -No charge
(6) Tires
Disposal by truckload or in mass numbers shall not be permitted.
The disposal of individual tires shall result in the following fees:
(A) Car Tires and pick up truck tires - $5.00 per tire
(B) Truck Tires - $15.00 per tire
(C) Tractor Tires - $30.00 per tire
(D) Tires on Rims ADDITIONAL - $5.00 per tire
(7) All fees will be due and payable at the time of disposal unless a monthly billing arrangement is approved in advance by the Richmond Sanitary District. (Ord. 7-2004)
More Categories:






