Section 23: V.54.23 : Excavations
All excavations required for the installation of a building sewer shall be open trench work unless otherwise approved by the Director. Pipe laying and backfill shall be performed in accordance with A.S.T.M. specifications (Designation C-12), except that no backfill shall be placed until the work has been inspected by the Director or his representatives. (Ord. 54-1981) Penalty, see 54.75 through 54.85