(A) Accidental discharges
Each Industrial User having the ability to cause interference with the POTW treatment plant or to violate the regulatory provisions of this Chapter shall provide protection against accidental discharge to the POTW of prohibited materials or other substances regulated by this Chapter. Facilities to prevent accidental discharge or prohibited materials from entering the POTW shall be provided and maintained at the User’s own cost and expense. All Industrial Users whose wastewater includes or could include compatible or incompatible pollutants in amounts great enough to cause interference with the POTW must have detailed plans on file at the District showing facilities and operating procedures to provide this protection. Plans shall be approved by the District before construction of the facility. Review and approval of such plans and operating procedures shall not relieve the Industrial User from the responsibility to modify its facility as necessary to meet the requirements of this Chapter.
(1) Notification
In the case of an accidental or deliberate discharge of compatible or incompatible pollutants which may cause interference at the POTW or violate regulatory requirements of this Chapter, it shall be the responsibility of the Industrial User to immediately telephone and notify the District of the incident. The notification shall include name of caller, location and time of discharge, type of wastewater, concentration, volume, and corrective actions. (Ord. 38-1985)
(2) Written report
Within ten (10) working days following such an accidental or deliberate discharge, the Industrial User shall submit to the Director a detailed written report describing the cause of the discharge and the measures to be taken by the User to prevent similar future occurrences. Follow-up reports may be required by the District as needed. Such report, or reports, shall not relieve the Industrial User of any expense, loss, damage or other liability which may be incurred as a result of damage to the POTW, fish kills, or any other damage to person or property; nor shall such report relieve the User of any fines, civil penalties, or other liability which may be imposed by the Chapter or otherwise. Failure to report accidental or deliberate dischargers may, in addition to any other remedies available to the District, result in the revocation of the User’s Wastewater Discharge Permit. (Ord. 38-1985)
(B) Slug Control Plan
At least once every two (2) years, the Director shall evaluate whether each Significant Industrial User needs an accidental discharge/slug control plan. The Director may require any User to develop, submit for approval, and implement such a plan. An accidental discharge/slug control plan shall address, at minimum, the following:
(1) Description of discharge practices, including nonroutine batch discharges;
(2) Description of stored chemicals;
(3) Procedures for immediately notifying the Director of any accidental or slug discharge, as set forth in 54.63(A) and 54.74(B) of this Chapter; and
(4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response.
Section 63: V.54.63 : Accidental Discharges / Slug Discharges
More Categories:
- Section 01: V.54.01
- Section 02: V.54.02
- Section 03: V.54.03
- Section 04: V.54.04
- Section 05: V.54.05
- Section 06: V.54.06
- Section 07: V.54.07
- Section 08: V.54.08
- Section 09: V.54.09
- Section 10: V.54.10
- Section 11: V.54.11
- Section 12: V.54.12
- Section 13: V.54.13
- Section 14: V.54.14
- Section 15: V.54.15
- Section 16: V.54.16
- Section 17: V.54.17
- Section 18: V.54.18
- Section 19: V.54.19
- Section 20: V.54.20
- Section 21: V.54.21
- Section 22: V.54.22
- Section 23: V.54.23
- Section 24: V.54.24
- Section 25: V.54.25
- Section 26: V.54.26
- Section 27: V.54.27
- Section 28: V.54.28
- Section 29: V.54.29
- Section 30: V.54.30
- Section 31: V.54.31
- Section 32: V.54.32
- Section 33: V.54.33
- Section 34: V.54.34
- Section 35: V.54.35
- Section 36: V.54.36
- Section 37: V.54.37
- Section 38: V.54.38
- Section 39: V.54.39
- Section 40: V.54.40
- Section 41: V.54.41
- Section 42: V.54.42
- Section 43: V.54.43
- Section 44: V.54.44
- Section 46: V.54.46
- Section 47: V.54.47
- Section 48: V.54.48
- Section 49: V.54.49
- Section 50: V.54.50
- Section 51: V.54.51
- Section 52: V.54.52
- Section 53: V.54.53
- Section 54: V.54.54
- Section 55: V.54.55
- Section 56: V.54.56
- Section 57: V.54.57
- Section 58: V.54.58
- Section 59: V.54.59
- Section 60: V.54.60
- Section 61: V.54.61
- Section 64: V.54.64
- Section 65: V.54.65
- Section 66: V.54.66
- Section 67: V.54.67
- Section 68: V.54.68
- Section 69: V.54.69
- Section 70: V.54.70
- Section 71: V.54.71
- Section 72: V.54.72
- Section 73: V.54.73
- Section 74: V.54.74
- Section 75: V.54.75
- Section 76: V.54.76
- Section 77: V.54.77
- Section 78: V.54.78
- Section 79: V.54.79
- Section 80: V.54.80
- Section 81: V.54.81
- Section 82: V.54.82
- Section 83: V.54.83
- Section 84: V.54.84
- Section 85: V.54.85
- Section 86: V.54.86
- Section 87: V.54.87
- Section 88: V.54.88
- Section 89: V.54.89
- Section 90: V.54.90
- Section 91: V.54.91
- Section 92: V.54.92